These Logistics Terms apply to all shipments of KELUM® aluminium hydroxide (hydrated alumina, CAS 21645-51-2, HS code 2818.30.0000) supplied by Hanzhong Delike New Materials Co., Ltd. They are incorporated into quotations, proforma invoices and sales contracts unless otherwise agreed in writing.
Aluminium hydroxide is NOT classified as dangerous goods for transport. Under ADR (road), RID (rail), IMDG (sea) and IATA DGR (air), it carries no UN number, no dangerous goods class and no packing group. Shipments therefore do not require DG placarding, dangerous goods declarations or specially trained drivers.
| Packaging Unit | Description |
|---|---|
| 25 kg bags | Kraft paper / PP woven bag with PE inner liner, heat-sealed. Palletised 40 bags per pallet (1,000 kg), stretch-wrapped with corner boards. |
| 1000 kg FIBC | Circular woven polypropylene big bag with PE liner and 4 lifting loops; coated body available for high-humidity routes. |
| 500 kg FIBC | Available on request for specific filling-line requirements. |
| Pallets | Heat-treated timber (ISPM 15) or plastic; export-grade wrapping against rain spray. |
Every unit is printed with product name, grade, batch number, net weight, manufacturer and country of origin for full traceability from factory to destination.
| Mode | Application | Typical Transit |
|---|---|---|
| Sea freight | Standard export mode. FCL recommended for loads of 16 MT or more (approx. 20 pallets per 20’ container); LCL with reinforced packaging for smaller lots. | 15–40 days to destination port |
| Rail freight | China–Europe block trains; efficient for EU and Central Asian destinations. | 15–25 days to terminal |
| Air freight | Samples and urgent small lots; airline moisture-protection requirements apply. | 3–7 days |
All modes require covered, dry transport. Open-top or flat-rack containers are not acceptable without prior written agreement.
Each shipment is accompanied by:
Deliveries follow Incoterms 2020 as agreed in the sales contract (EXW, FOB, CFR, CIF, CIP or DAP). Risk passes to the buyer at the named point of the agreed Incoterm.
| Stage | Timeframe |
|---|---|
| Production lead time (standard grades) | 7–15 days after order confirmation and deposit |
| Container booking | 2–5 days after cargo readiness |
| Sea freight | 15–40 days to destination port (region-dependent) |
| Rail freight | 15–25 days to European terminals |
| Air freight | 3–7 days door to door for small lots |
Delays caused by customs, port congestion, adverse weather or other force majeure events are notified within 3 working days and shipments are re-scheduled promptly.